Advanced modeling and simulation of flow in subsurface reservoirs with fractures and wells for a sustainable industry
Open Access
Issue
Oil Gas Sci. Technol. – Rev. IFP Energies nouvelles
Volume 75, 2020
Advanced modeling and simulation of flow in subsurface reservoirs with fractures and wells for a sustainable industry
Article Number 39
Number of page(s) 13
DOI https://doi.org/10.2516/ogst/2020034
Published online 16 June 2020
  • Al-Enezi K., Das O.P., Aslam M., Ziyad K., Fipke S.R. (2012) Successful case histories of smart multilateral well with inflow control device and inflow control valve for life-cycle proactive reservoir management in high mobility reservoir, Minagish Field West Kuwait, in: SPE 161632, Abu Dhabi International Petroleum Conference and Exhibition, 11–14 November. [Google Scholar]
  • Al-Khelaiwi F.T.M. (2013) A comprehensive approach to the design of advanced well completions, PhD Dissertation, Heriot-Watt University, Edinburgh. [Google Scholar]
  • Al-Khelaiwi F.T., Davies D.R. (2007) Inflow control devices: Application and value quantification of a developing technology, in: Paper SPE 108700 Presented at the 2007 International Oil Conference and Exhibition, Veracruz, Mexico, 27–30 June. [Google Scholar]
  • Al-Thuwaini J., Shenawi S., Shenawi S., Yuen B. (2009) Simulation and optimisation of complex architecture wells with smart completions, in: Paper OTC 20131 Presented at the 2009 Offshore Technology Conference held in Houston, Texas, USA, 4–7 May. [Google Scholar]
  • Brekke K., Lien S. (1992) New and simple completion methods for horizontal wells improved production performance in high-permeability thin oil zones, in: SPE 24762 Presented at the 67th SPE Annual Technical Conference and Exhibition, Washington, DC, USA, 4–7 October. [Google Scholar]
  • Broni-Bediako E., Issaka Fuseini N., Ayitey Akoto R.N., Thompson Brantson E. (2019) Application of intelligent well completion in optimising oil production from oil rim reservoirs, Adv. Geo-Energy Res. 3, 4, 343–354. doi: 10.26804/ager.2019.04.01. [CrossRef] [Google Scholar]
  • Christie M.A., Blunt M.J. (2001) Tenth SPE comparative solution project: A comparison of upscaling techniques, SPE Reserv. Evalu. Eng., pp. 308–317. [Google Scholar]
  • Das O.P., Al-Enezi K. (2014) A novel workflow for intelligent well inflow control valve design by integrating reservoir dynamics to facilitate proactive reservoir management in Minagish Field, West Kuwait, in: SPE 170803 Presented at the SPE Annual Technical Conference and Exhibition Held in Amsterdam, The Netherlands, 27–29 October. [Google Scholar]
  • Das O.P., Al-Enezi K., Aslam M., El-Gezeeri T., Ziyab K., Fipke S.R., Ewens S. (2012) Novel design and implementation of Kuwait’s first smart multilateral well with inflow control device and inflow control valve for life-cycle reservoir management in high mobility reservoir, West Kuwait, in: SPE 159261 Presented at SPE Annual Technical Conference and Exhibition, 8–10 October, San Antonio, USA. [Google Scholar]
  • Dimitios K., Hembling D., Al-Dawood N., Al-Qatari S., Simonian S., Salerno G. (2009) Optimizing horizontal well performance in nonuniform pressure environments using passive inflow control devices, in: Paper OTC 20129 Presented at the 2009 Offshore Technology Conference held in Houston, Texas, USA, 4–7 May. [Google Scholar]
  • Gurses S., Chochua G., Rudic A., Kumar A. (2019) Dynamic Modeling and Design Optimization of Cyclonic Autonomous Inflow Control Devices, in: SPE 193824 presented at the SPE Reservoir Simulation Conference, Galveston, TX, USA, 10-11 April. doi: 10.2118/193824-MS [Google Scholar]
  • HoJeen S., Dogru A. (2007) Modeling of equalizer production system and smart well applications in full-field studies, in: Paper SPE 111288 Presented at the 2007 SPE/EAGE Reservoir Characterization and Simulation Conference, Abu Dhabi, UAE, 28–31 October. [Google Scholar]
  • Holmes J.A., Barkve T., Lund O. (1998) Application of a multisegment well model to simulate flow in advanced wells, in: SPE 50646 Presented at the European Petroleum Conference, 20–22 October, The Hague, Netherlands. [Google Scholar]
  • Holmes J.A., Byer T.J., Edwards D.A., Stone T.W., Pallister I., Shaw G.J., Walsh D. (2010) A unified wellbore model for reservoir simulation, in: SPE 134928 Presented at the SPE Annual Technical Conference and Exhibition, 19–22 September, Florence, Italy. [Google Scholar]
  • Javid K., Mustafa M., Chitre S., Anurag A., Sayed M., Kuliyev M., Mishra A., Khalili Al Hosany K., Saeed Y. (2018) Comprehensive ICD/ICV completion design workflow practiced in Green oilfield offshore, Abu Dhabi, in: Paper SPE 192645 Presented at the Abu Dhabi International Petroleum Exhibition & Conference, Abu Dhabi, UAE, 12–15 November. [Google Scholar]
  • Lauritzen J.E., Martiniussen I.B. (2011) Single and multi-phase flow loop testing results for industry standard inflow control devices, in: SPE 146347 Presented at the Offshore Europe, 6–8 September, Aberdeen, UK. [Google Scholar]
  • Raffn A.G., Hundsnes S., Kvernstuen S., Moen T. (2007) ICD screen technology used to optimize waterflooding in injector well, in: SPE 106018, Presented at the SPE Production and Operations Symposium, Oklahoma City, Oklahoma, USA, 31 March–3 April. [Google Scholar]
  • Stone T., Moen T., Edwards D., Shadchnev A., Rashid K., Kvilaas G., Christoffersen K. (2015) Optimized design of autonomous inflow control devices for gas and water coning, in: SPE 173203 Presented at the SPE Reservoir Simulation Symposium, Houston, 23–25 February. [Google Scholar]
  • Wan J., Dale B.A., Ellison T.K., Benish T.G., Grubert M. (2008) Coupled well and reservoir simulation models to optimize completion design and operations for subsurface control, in: Paper SPE 113635 Presented at the 2008 Europec/EAGE Annual Technical Conference and Exhibition, Rome, Italy, 9–12 June. [Google Scholar]
  • Youngs B., Neylon K., Holmes J. (2009) Recent advances in modeling well inflow control devices in reservoir simulation, in: IPCT 13925, Doha, Qatar, 7–9 December. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.