- Al-Enezi K., Das O.P., Aslam M., Ziyad K., Fipke S.R. (2012) Successful case histories of smart multilateral well with inflow control device and inflow control valve for life-cycle proactive reservoir management in high mobility reservoir, Minagish Field West Kuwait, in: SPE 161632, Abu Dhabi International Petroleum Conference and Exhibition, 11–14 November. [Google Scholar]
- Al-Khelaiwi F.T.M. (2013) A comprehensive approach to the design of advanced well completions, PhD Dissertation, Heriot-Watt University, Edinburgh. [Google Scholar]
- Al-Khelaiwi F.T., Davies D.R. (2007) Inflow control devices: Application and value quantification of a developing technology, in: Paper SPE 108700 Presented at the 2007 International Oil Conference and Exhibition, Veracruz, Mexico, 27–30 June. [Google Scholar]
- Al-Thuwaini J., Shenawi S., Shenawi S., Yuen B. (2009) Simulation and optimisation of complex architecture wells with smart completions, in: Paper OTC 20131 Presented at the 2009 Offshore Technology Conference held in Houston, Texas, USA, 4–7 May. [Google Scholar]
- Brekke K., Lien S. (1992) New and simple completion methods for horizontal wells improved production performance in high-permeability thin oil zones, in: SPE 24762 Presented at the 67th SPE Annual Technical Conference and Exhibition, Washington, DC, USA, 4–7 October. [Google Scholar]
- Broni-Bediako E., Issaka Fuseini N., Ayitey Akoto R.N., Thompson Brantson E. (2019) Application of intelligent well completion in optimising oil production from oil rim reservoirs, Adv. Geo-Energy Res. 3, 4, 343–354. doi: 10.26804/ager.2019.04.01. [CrossRef] [Google Scholar]
- Christie M.A., Blunt M.J. (2001) Tenth SPE comparative solution project: A comparison of upscaling techniques, SPE Reserv. Evalu. Eng., pp. 308–317. [Google Scholar]
- Das O.P., Al-Enezi K. (2014) A novel workflow for intelligent well inflow control valve design by integrating reservoir dynamics to facilitate proactive reservoir management in Minagish Field, West Kuwait, in: SPE 170803 Presented at the SPE Annual Technical Conference and Exhibition Held in Amsterdam, The Netherlands, 27–29 October. [Google Scholar]
- Das O.P., Al-Enezi K., Aslam M., El-Gezeeri T., Ziyab K., Fipke S.R., Ewens S. (2012) Novel design and implementation of Kuwait’s first smart multilateral well with inflow control device and inflow control valve for life-cycle reservoir management in high mobility reservoir, West Kuwait, in: SPE 159261 Presented at SPE Annual Technical Conference and Exhibition, 8–10 October, San Antonio, USA. [Google Scholar]
- Dimitios K., Hembling D., Al-Dawood N., Al-Qatari S., Simonian S., Salerno G. (2009) Optimizing horizontal well performance in nonuniform pressure environments using passive inflow control devices, in: Paper OTC 20129 Presented at the 2009 Offshore Technology Conference held in Houston, Texas, USA, 4–7 May. [Google Scholar]
- Gurses S., Chochua G., Rudic A., Kumar A. (2019) Dynamic Modeling and Design Optimization of Cyclonic Autonomous Inflow Control Devices, in: SPE 193824 presented at the SPE Reservoir Simulation Conference, Galveston, TX, USA, 10-11 April. doi: 10.2118/193824-MS [Google Scholar]
- HoJeen S., Dogru A. (2007) Modeling of equalizer production system and smart well applications in full-field studies, in: Paper SPE 111288 Presented at the 2007 SPE/EAGE Reservoir Characterization and Simulation Conference, Abu Dhabi, UAE, 28–31 October. [Google Scholar]
- Holmes J.A., Barkve T., Lund O. (1998) Application of a multisegment well model to simulate flow in advanced wells, in: SPE 50646 Presented at the European Petroleum Conference, 20–22 October, The Hague, Netherlands. [Google Scholar]
- Holmes J.A., Byer T.J., Edwards D.A., Stone T.W., Pallister I., Shaw G.J., Walsh D. (2010) A unified wellbore model for reservoir simulation, in: SPE 134928 Presented at the SPE Annual Technical Conference and Exhibition, 19–22 September, Florence, Italy. [Google Scholar]
- Javid K., Mustafa M., Chitre S., Anurag A., Sayed M., Kuliyev M., Mishra A., Khalili Al Hosany K., Saeed Y. (2018) Comprehensive ICD/ICV completion design workflow practiced in Green oilfield offshore, Abu Dhabi, in: Paper SPE 192645 Presented at the Abu Dhabi International Petroleum Exhibition & Conference, Abu Dhabi, UAE, 12–15 November. [Google Scholar]
- Lauritzen J.E., Martiniussen I.B. (2011) Single and multi-phase flow loop testing results for industry standard inflow control devices, in: SPE 146347 Presented at the Offshore Europe, 6–8 September, Aberdeen, UK. [Google Scholar]
- Raffn A.G., Hundsnes S., Kvernstuen S., Moen T. (2007) ICD screen technology used to optimize waterflooding in injector well, in: SPE 106018, Presented at the SPE Production and Operations Symposium, Oklahoma City, Oklahoma, USA, 31 March–3 April. [Google Scholar]
- Stone T., Moen T., Edwards D., Shadchnev A., Rashid K., Kvilaas G., Christoffersen K. (2015) Optimized design of autonomous inflow control devices for gas and water coning, in: SPE 173203 Presented at the SPE Reservoir Simulation Symposium, Houston, 23–25 February. [Google Scholar]
- Wan J., Dale B.A., Ellison T.K., Benish T.G., Grubert M. (2008) Coupled well and reservoir simulation models to optimize completion design and operations for subsurface control, in: Paper SPE 113635 Presented at the 2008 Europec/EAGE Annual Technical Conference and Exhibition, Rome, Italy, 9–12 June. [Google Scholar]
- Youngs B., Neylon K., Holmes J. (2009) Recent advances in modeling well inflow control devices in reservoir simulation, in: IPCT 13925, Doha, Qatar, 7–9 December. [Google Scholar]
Numéro |
Oil Gas Sci. Technol. – Rev. IFP Energies nouvelles
Volume 75, 2020
Advanced modeling and simulation of flow in subsurface reservoirs with fractures and wells for a sustainable industry
|
|
---|---|---|
Numéro d'article | 39 | |
Nombre de pages | 13 | |
DOI | https://doi.org/10.2516/ogst/2020034 | |
Publié en ligne | 16 juin 2020 |
Les statistiques affichées correspondent au cumul d'une part des vues des résumés de l'article et d'autre part des vues et téléchargements de l'article plein-texte (PDF, Full-HTML, ePub... selon les formats disponibles) sur la platefome Vision4Press.
Les statistiques sont disponibles avec un délai de 48 à 96 heures et sont mises à jour quotidiennement en semaine.
Le chargement des statistiques peut être long.