Open Access
Numéro
Oil Gas Sci. Technol. – Rev. IFP
Volume 65, Numéro 2, March-April 2010
Page(s) 315 - 330
DOI https://doi.org/10.2516/ogst/2009044
Publié en ligne 27 novembre 2009
  • Brander G., Magne E., Newman T., Taklo T., Mitchell C. (2004) Drilling in Brazil in 2887 m Water Depth using a Surface BOP system and a DP Vessel, SPE paper 87113-MS. [Google Scholar]
  • Guidelines for the use of Surface BOP’s from floating MODU’s, IADC, 2004. [Google Scholar]
  • Azancot P., Magne E., Zhang J. (2002) Surface BOP – Management System & Design Guidelines, SPE paper 74531-MS. [Google Scholar]
  • API RP 16Q (1993) Recommended Practice for Design, Selection, Operation and Maintenance of Marine Drilling Systems, First Edition, Formerly RP2Q and RP2K. [Google Scholar]
  • API Spec 16R (1997) Specification for Marine Drilling Riser Couplings, First Edition, Formerly API RP 2R. [Google Scholar]
  • API Spec 2RD (1998) Design of risers for Floating Production Systems (FPSS) and Tension-Leg Platform (TLPS), First Edition. [Google Scholar]
  • Heurtier J.M., Biolley F., Berhault C. (1998) Fully coupled dynamic analysis of rigid lines, Proceedings of ISOPE 98, Montreal, pp. 246-252. [Google Scholar]
  • Toumit S. (2009) Diodore and DeepLines software validation report, PRINCIPIA réf. DVA.945.054.01, février 2009. [Google Scholar]
  • Lepeuvedic J.P., Guesnon J., Soleille L.M. (1984) A fast coupling for a deepwater drilling riser, SPE Paper 13153, 59th Annual Technical Conference and Exhibition of the SPE, Houston, 1984. [Google Scholar]
  • De Bonnafos O., Guesnon J. (2000) Riser system for 3000 m water depth – Pride Africa/Pride Angola approach, IADC World Drilling Congress, Paris, 2000. [Google Scholar]
  • Guesnon J., Gaillard C., Schaeffner P. (2002) Hybrid Tubes for Choke and Kill Lines, Offshore Technology Conference, Houston, 2002. [Google Scholar]
  • Poirette Y., Guesnon J., Averbuch D., Dupuis D. (2009) Field Testing of Hybrid Choke & Kill Lines, Offshore Technology Conference, Houston, 2009. [Google Scholar]

Les statistiques affichées correspondent au cumul d'une part des vues des résumés de l'article et d'autre part des vues et téléchargements de l'article plein-texte (PDF, Full-HTML, ePub... selon les formats disponibles) sur la platefome Vision4Press.

Les statistiques sont disponibles avec un délai de 48 à 96 heures et sont mises à jour quotidiennement en semaine.

Le chargement des statistiques peut être long.