Table 4.
The time ratio spending in each operation: Transport solver and source term solver (Evaporation+drag) for different MPI process number
MPI process number | Mesh adaptation (%) | Transport solver (%) | Term source solver (%) |
---|---|---|---|
1 | 0.1 | 2.5 | 97.3 |
24 | 0.7 | 2.2 | 97.3 |
60 | 0.9 | 2.2 | 95.7 |
84 | 4.8 | 2.7 | 91.6 |
96 | 6.16 | 2.8 | 90.5 |