- Abellan A., Noetinger B. (2010) Optimizing subsurface field data acquisition using information theory, Math. Geosci. 42, 603–630. https://doi.org/10.1007/s11004-010-9285-6. [Google Scholar]
- Adlam J. (1995) The Norne Field Development Overview. Offshore Technology Conference, Houston, 1–4 May, OTC-7925-MS. https://doi.org/10.4043/7925-MS [Google Scholar]
- Bailey W.J., Couët B., Prange M. (2011) Forecast optimization and value of information under uncertainty, in: Ma Y.Z., La Pointe P.R. (eds), Uncertainty analysis and reservoir modeling: AAPG Memoir 96, 217–233. doi: 10.1306/13301416M963484. [Google Scholar]
- Ballin P.R., Ward G.S., Whorlow C.V., Khan T. (2005) Value of information for a 4-D seismic acquisition project. SPE 94918-MS, Annual Technical Conference and Exhibition, Denver, Colorado, USA. https://doi.org/10.2118/94918-MS. [Google Scholar]
- Barros E.G.D., Jansen J.D., van den Hof P.M.J. (2015) Value of information in parameter identification and optimization of hydrocarbon reservoirs, IFAC-Papers OnLine 48, 6, 229–235. https://doi.org/10.1016/j.ifacol.2015.08.036. [CrossRef] [Google Scholar]
- Barros E.G.D., van den Hof P.M.J., Jansen J.D. (2016) Value of information in closed-loop reservoir management, Comp. Geosci. 20, 3, 737–749. https://doi.org/10.1007/s10596-015-9509. [CrossRef] [Google Scholar]
- Begg S., Bratvold R., Campbell J. (2002) The value of flexibility in managing uncertainty in oil and gas investments. SPE 77586-MS, Annual Technical Conference and Exhibition, San Antonio, Texas, USA. https://doi.org/10.2118/77586-MS. [Google Scholar]
- Bratvold R.B., Bickel J.E., Lohne H.P. (2009) Value of information in the oil and gas industry: Past, present and future. SPE 110378-PA, SPE Reserv. Eval. Eng. 12, 4, 630–638. https://doi.org/10.2118/110378-PA. [Google Scholar]
- Chen B., He J., Wen X.H., Chen W., Reynolds A.C. (2017) Uncertainty quantification and value of information assessment using proxies and Markov chain Monte Carlo method for a pilot project, J. Petrol. Sci. Eng. 157, 328–339. https://doi.org/10.1016/j.petrol.2017.07.039. [CrossRef] [Google Scholar]
- Clemen R.T. (1996) Making hard decisions: An introduction to decision analysis, Second Edition, Duxbury Press, USA. [Google Scholar]
- Coopersmith E.M., Cunningham P.C. (2002) A practical approach to evaluating the value of information and real option decisions in the upstream petroleum industry. SPE 77582-MS, Annual Technical Conference and Exhibition, San Antonio, Texas, USA. https://doi.org/10.2118/77582-MS. [Google Scholar]
- Costa A.P.A., Schiozer D.J., Moczydlower P., Bedrikovetsky P. (2008) Use of representative models to improve the decision making process of chemical flooding in a mature field. SPE 115442, SPE Russian Oil & Gas Technical Conference and Exhibition, Moscow, Russia. https://doi.org/10.2118/115442-MS. [Google Scholar]
- Davolio A., Schiozer D.J. (2018) Probabilistic seismic history matching using binary images, J. Geophys. 15, 2018, 261–274. https://doi.org/10.1088/1742-2140/aa99f4. [Google Scholar]
- Dunn M.D. (1992) A method to estimate the value of well log information. SPE 24672-MS, Annual Technical Conference and Exhibition, Washington, D.C., USA. https://doi.org/10.2118/24672-MS. [Google Scholar]
- Eidsvik J., Mukerji T., Bhattacharjya D. (2015) Value of information in the Earth sciences: Integrating spatial modeling and decision analysis, 1st edn., Cambridge University Press, Cambridge, United Kingdom. [CrossRef] [Google Scholar]
- Evensen G. (1994) Sequential data assimilation with a nonlinear quasi-geostrophic model using Monte Carlo methods to forecast error statistics, J. Geophys. 99, C5, 10143–10162. https://doi.org/10.1029/94JC00572. [Google Scholar]
- Ferreira C.J., Schiozer D.J. (2013) Time-lapse seismic and engineering data integration to estimate best time for seismic acquisition data. SPE 164914-MS, EAGE Annual Conference & Exhibition Incorporating Europec, London, United Kingdom. https://doi.org/10.2118/164914-MS. [Google Scholar]
- Ferreira C.J., Schiozer D.J. (2014) Methodology to estimate the chance of success of a time-lapse seismic project using reservoir simulation. SPE 170674-MS, Annual Technical Conference and Exhibition, Amsterdam, The Netherlands. https://doi.org/10.2118/170674-MS. [Google Scholar]
- Ferreira C.J., Davolio A., Maschio C., Schiozer D.J. (2011) Evaluation of the seismic time_lapse acquisition period in reservoir monitoring. OTC-22740, Offshore Technology Conference Brasil, Rio de Janeiro, Brazil. https://doi.org/10.4043/22740-MS. [Google Scholar]
- Ferreira C.J., Davolio A., Schiozer D.J. (2015) Improving the estimation of the chance of success of a 4D seismic project based on representative models. SPE 174386-MS, SPE Europec, Madrid, Spain. https://doi.org/10.2118/174386-MS. [Google Scholar]
- Galli A., Armstrong M., Dias M.A.G. (2004) The value of information: A Bayesian real option approach. SPE 90418-MS, Annual Technical Conference and Exhibition, Houston, Texas, USA. https://doi.org/10.2118/90418-MS. [Google Scholar]
- Gerhardt J.H., Haldorsen H.H. (1989) On the Value of Information. SPE 19291-MS, Offshore Europe, Aberdeen, United Kingdom. https://doi.org/10.2118/19291-MS. [Google Scholar]
- Grayson C.J. Jr. (1960) Decisions under uncertainty: Drilling decisions by oil and gas operators, Harvard University Press, Boston, Massachusetts, USA. [Google Scholar]
- He J., Xie J., Sarma P., Wen X.H., Chen W.H., Kamath J. (2016) Proxy-based Work flow for a priori evaluation of data-acquisition programs, SPE J. 21, 4, SPE-173229-PA. https://doi.org/10.2118/173229-PA. [Google Scholar]
- Hong A.J., Bratvold R.B., Thomas P., Hanea R.G. (2018) Value-of-information for model parameter updating through history matching, J. Petrol. Sci. Eng. 165, 253–268. https://doi.org/10.1016/j.petrol.2017.08.028. [CrossRef] [Google Scholar]
- Howard R.A. (1966) Information value theory, IEEE T. Syst. Man. Cyb. 2, 1, 22–26, http://dx.doi.org/10.1109/TSSC.1966.300074. [Google Scholar]
- Le Ravalec M., Tillier E., Da Veiga S., Enchéry G., Gervais V. (2012a) Advanced integrated workflows for incorporating both production and 4D seismic-related data into reservoir models, Oil Gas Sci. Technol. - Rev. IFP Energies nouvelles 67, 2, 207–220. https://doi.org/10.2516/ogst/2011159. [CrossRef] [Google Scholar]
- Le Ravalec M., Da Veiga S., Derfoul R., Enchéry G., Gervais V., Roggero F. (2012b) Integrating Data of Different Types and Different Supports into Reservoir Models, Oil Gas Sci. Technol. - Rev. IFP Energies nouvelles 67, 5, 823–839. https://doi.org/10.2516/ogst/2012024. [CrossRef] [Google Scholar]
- Lind O. (2004) Annual Reservoir Development Plan – Norne Field, Statoil Internal Report. [Google Scholar]
- Marques M.D., Gaspar A.T., Schiozer D.J. (2013) Use of oil reservoir simulation to estimate value of flexibility. SPE 164878, EAGE Annual Conference & Exhibition incorporating Europec, London, United Kingdom. https://doi.org/10.2118/164878-MS [Google Scholar]
- Meira L.A.A., Coelho G.P., Santos A.A.S., Schiozer D.J. (2016) Selection of representative models for decision analysis under uncertainty, Comput. Geosci. 88, 67–82. https://doi.org/10.1016/j.cageo.2015.11.012 [Google Scholar]
- Meira L.A.A., Coelho G.P., Silva C.G., Santos A.A.S., Schiozer D.J. (2017) RMFinder 2.0: An improved interactive multi-criteria scenario reduction methodology. SPE 185502, SPE Latin America and Caribbean Petroleum Engineering Conference. https://doi.org/10.1016/j.cageo.2015.11.012 [Google Scholar]
- Raiffa H. (1968) Decision analysis: Introductory lectures on choices under uncertainty, Addison-Wesley, Reading, Massachusetts, USA. [Google Scholar]
- Roggero F., Lerat O., Ding D.Y., Berthet P., Bordenave C., Lefeuvre F., Perfetti P. (2012) History matching of production and 4D seismic data: Application to the Girassol Field, Offshore Angola, Oil Gas Sci. Technol. - Rev. IFP Energies nouvelles 67, 2, 237–262. https://doi.org/10.2516/ogst/2011148 [CrossRef] [Google Scholar]
- Santos S.M.G., Gaspar A.T.F.S., Schiozer D.J. (2017) Value of information in reservoir development projects: Technical indicators to prioritize uncertainties and information sources, J. Petrol. Sci. Eng. 157, 1179–1191. https://doi.org/10.1016/j.petrol.2017.08.028 [CrossRef] [Google Scholar]
- Sarma P., Chen W.H., Xie J. (2013) Selecting representative models from a large set of models. SPE 163671, SPE Reservoir Simulation Symposium, The Woodlands, Texas, USA. https://doi.org/10.2118/163671-MS. [Google Scholar]
- Schiozer D.J., Ligero E.L., Suslick S.B., Costa A.P.A., Santos J.A.M. (2004) Use of representative models in the integration of risk analysis and production strategy definition, J. Petrol. Sci. Eng. 44, 1–2, 131–141. https://doi.org/10.1016/j.petrol.2004.02.010 [CrossRef] [Google Scholar]
- Schlaifer R. (1959) Probability and statistics for business decisions: an introduction to managerial economics under uncertainty, McGraw-Hill Book Company, New York City, USA. [Google Scholar]
- Shirangi M.G., Durlofsky L.J. (2015) Closed-loop field development under uncertainty by use of optimization with sample validation. SPE 173219-PA, SPE J. 20, 5, 908–922. https://doi.org/10.2118/173219-PA [CrossRef] [Google Scholar]
- Tillier E., Le Ravalec M., Da Veiga S. (2012) Simultaneous inversion of production data and seismic attributes: application to a synthetic SAGD produced field case, Oil Gas Sci. Technol. - Rev. IFP Energies nouvelles 67, 2, 289–301. https://doi.org/10.2516/ogst/2012004 [CrossRef] [Google Scholar]
- Waggoner J.R. (2002) Quantifying the Economic Impact of 4D Seismic Projects. SPE 77969-PA, SPE Reserv. Eval. Eng. 5, 2, 111–115. https://doi.org/10.2118/77969-PA [Google Scholar]
Open Access
Numéro |
Oil & Gas Science and Technology - Rev. IFP Energies nouvelles
Volume 73, 2018
|
|
---|---|---|
Numéro d'article | 54 | |
Nombre de pages | 14 | |
DOI | https://doi.org/10.2516/ogst/2018054 | |
Publié en ligne | 20 novembre 2018 |
Les statistiques affichées correspondent au cumul d'une part des vues des résumés de l'article et d'autre part des vues et téléchargements de l'article plein-texte (PDF, Full-HTML, ePub... selon les formats disponibles) sur la platefome Vision4Press.
Les statistiques sont disponibles avec un délai de 48 à 96 heures et sont mises à jour quotidiennement en semaine.
Le chargement des statistiques peut être long.