Table 6.
Effect of integration on the reservoir performance indicators (using base strategies).
NPV-D to NPV-DI | ΔNPV | ΔN p | ΔW p | ΔW i |
---|---|---|---|---|
Optimization A | −2.7% | −2.0% | 8.0% | 3.8% |
Optimization B | −5.5% | −3.7% | −41.8% | −14.7% |
Optimization C | −0.7% | 0.2% | −0.1% | 0.0% |