Table 2

The results of dynamic hanging loads on polished rod for the different phases of CBM producing process in Zhengzhuang and Sanjiao coalfield.

Zhengzhuang coalfield
Sanjiao coalfield
Stroke Static loadFJ (kN) Inertial load FQ (kN) Vibration load FV (kN) Friction load FM (kN) Total load F (kN) Static load FJ (kN) Inertial load FQ (kN) Vibration load FV (kN) Friction load FM (kN) Total load F (kN)
Upstroke 24.05 2.75 1.43 0.91 29.14 22.42 2.17 1.76 1.11 27.46
24.29 1.35 0.96 0.90 27.50 24.24 1.14 1.20 1.10 27.69
22.53 0.56 0.54 0.90 24.53 26.67 0.39 0.82 1.09 28.98
23.33 0.11 0.24 0.89 24.57 27.31 0.16 0.59 1.09 29.16
Downstroke 14.52 1.39 1.43 1.34 10.36 13.50 1.03 1.76 1.45 9.26
14.52 0.69 0.96 1.11 11.76 13.50 0.54 1.20 1.28 10.48
14.52 0.28 0.54 0.99 12.71 13.50 0.19 0.82 1.17 11.32
14.52 0.06 0.24 0.91 13.31 13.50 0.08 0.59 1.13 11.71

Les statistiques affichées correspondent au cumul d'une part des vues des résumés de l'article et d'autre part des vues et téléchargements de l'article plein-texte (PDF, Full-HTML, ePub... selon les formats disponibles) sur la platefome Vision4Press.

Les statistiques sont disponibles avec un délai de 48 à 96 heures et sont mises à jour quotidiennement en semaine.

Le chargement des statistiques peut être long.