Figure 3.

Download original image
Configuration of the GBP experiment after sample water saturation, from [5]. Argon gas injection pressure is stabilized through an upstream buffer reservoir, and all measurements are performed on the sample downstream side, in a 2 cl chamber closed by a valve, which is opened regularly (every 24-72 h) for GBP assessment.