Numerical methods and HPC
Open Access

Fig. 10.

image

Download original image

Loop Dependency. Example of loop carried dependency between iteration instances with two valid schedules. A point represents the execution of one statement instance. For the dependence graph, an arrow represents a dependence: some instances have to be executed before the target instances. For the schedules, the arrows represent the execution order. Schedule 1 exhibits the maximum parallelism at iteration level whereas schedule 2 focuses on parallelism at the cell level. The code generated with the first schedule requires more cell-transition checks than it would with the second one.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.