- Pavone, D. (1999) Interactive Drilling for Fast Track Oilfield Developement, J. Lecourtier (ed.), Éditions Technip, Paris. [Google Scholar]
- Pavone, D. and Desplans, J.P. (1994) Application of High Sampling Rate Downhole Measurements for Analysis and Cure of Stick-Slip in Drilling. SPE 28324. [Google Scholar]
- Mabile, C., Pavone, D. and Desplans, J.P. (1996) A New Way of Using Surface Measurements to Detect Downhole Vibrations. SPE 36883. [Google Scholar]
- Rey-Fabret, I., Oudin, N. and Mabile, C. (1997) Detecting Whirling Behaviour of the Drill String from Surface Measurements. SPE 38587. [Google Scholar]
- Mabile, C., Fay, J.B. and Desloovere, O. (1997) Standard Surface Measurements Sampled at High Acquisition Rate Help in Detecting Drill String Vibrations. OMC 8997. [Google Scholar]
- DePazzis, L., Delahaye, T., Besson, J.L. and Lombez, J.P. (1989) New Gas Logging System Improves Gas Shows, Analysis and Interpretation. SPE 19605. [Google Scholar]
- Harris, T.W.R., Werker, R, Debray, B., Lecann, J.P. and Desloovere, O. (1997) New Delta Flow Kick Detection System Ensures Safer Drilling. OMC 2297. [Google Scholar]
- Naegel, M., Pradié, E., Delahaye, T., Mabile, C. and Roussiaux, G. (1998) Cutting Flow Monitor Cleaning in Extended Reach Wells. SPE 50677. [Google Scholar]
- Roussiaux, G. and Ross, K. (1999) Cuttings Flow Meter Takes Guesswork Out of Hole Cleaning. Petroleum Engineer International. [Google Scholar]
- Ten Haven, H.L., Arbin, P., Simon, B., Collo, G., Le Cann, J.P. and Mulero, P. (1998) Applications and Limitations of Mud Logging Gas Data in the Detection of Formation Fluids and Overpressure Examples from South East Asia. IPA Indonesia, Oct. [Google Scholar]
- Beda, G., Quagliaroli, R., Segalini, G., Barraud, G. and Mitchel, A. (1999) A Real Time Geologic and Reservoir Interpretation Tool. SPWLA, Gas While Drilling (GWD), June. [Google Scholar]
- Natini, F., Dini Erga-Enel, I., Certo, M., Cola-Enel, T., Soulier, L., Cecconi, F. Naville, C. and Serbutoviez, S. (2000) Seismic While Drilling Measurements in Italian Deep Geothermal Wells. WGC 2000. [Google Scholar]
- Naville, C., Serbutoviez, S., Throo, A., Batini, F., Dini Erage-Enel, I. and Cecconi, F. (2000) Drillbit SWD Reverse Walkaway Using Downhole Reference Signal. SPE 65115. [Google Scholar]
- Lurie, P., Head, P. and Smith, J.E. (2003) Smart Drilling with Electric DillstringTM. SPE/IADC 79886. [Google Scholar]
- Jellison, N.J. and Hall, D.R (2003) Intelligent Drill Pipe Creates the Drilling Network. SPE 80454. Jellison, M.J. et al. (2003) Telemetry Drill Pipe: Enabling Technology for the Downhole Internet. SPE 79885. [Google Scholar]
- A.J. Branch et al. (2001) Real-Time Well Construction - A Case History of Sincor's Heavy Oil Project. SPE/IADC 67757. [Google Scholar]
- Vaisberg, O.,Vincké, O.,Perrin, G.,Sarda, J.P. and Fay, J.B. (2002) Fatigue of Drillstring: State of the Art. Oil & Gas Science and Technology - Revue de l'IFP, 57, 1, 7-37. [CrossRef] [EDP Sciences] [Google Scholar]
Open Access
Numéro |
Oil & Gas Science and Technology - Rev. IFP
Volume 59, Numéro 4, July-August 2004
Dossier: Interactive Drilling
|
|
---|---|---|
Page(s) | 343 - 356 | |
DOI | https://doi.org/10.2516/ogst:2004025 | |
Publié en ligne | 1 décembre 2006 |
Les statistiques affichées correspondent au cumul d'une part des vues des résumés de l'article et d'autre part des vues et téléchargements de l'article plein-texte (PDF, Full-HTML, ePub... selon les formats disponibles) sur la platefome Vision4Press.
Les statistiques sont disponibles avec un délai de 48 à 96 heures et sont mises à jour quotidiennement en semaine.
Le chargement des statistiques peut être long.