Table 1
Variables and criteria in Conceptual Design (CD) and Process Design (PD).
| Variables |
Criteria |
|||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Synthesis | Design |
Yield | Product quality | Energy | OPEX | CAPEX | GWP | LCA | ||
| Operating conditions | Sizing | |||||||||
| Conversion | CD | CD | PD | CD | CD | CD | ||||
| Separation | CD | CD | PD | CD | CD | CD | ||||
| Energy balances | PD | PD | PD | PD | PD | PD | PD | |||
| Pressure balances | PD | PD | PD | PD | PD | PD | PD | |||