Numerical methods and HPC
Open Access

Table 3

Well test schedule and fluids composition.

Water injection Tracer injection Water injection Shut-in Production
Duration (days) 10 0.5 1.5 3 5
Cumulative duration (days) 10 10.5 12 15 20
Flow rate
Aqueous composition ppm
Comment Waterflood leading to a residual (immobile) oil saturation state S orw in the near wellbore region Inert tracer and ester injection; ester partition between water and oil; small amount of alcohol generated Ester pushed 5 m away from the well; small amount of generated alcohol is pushed downstream the ester Significant amount of alcohol generated from ester degradation Recovery of ester and tracer; production of alcohol; delay between alcohol and ester

Les statistiques affichées correspondent au cumul d'une part des vues des résumés de l'article et d'autre part des vues et téléchargements de l'article plein-texte (PDF, Full-HTML, ePub... selon les formats disponibles) sur la platefome Vision4Press.

Les statistiques sont disponibles avec un délai de 48 à 96 heures et sont mises à jour quotidiennement en semaine.

Le chargement des statistiques peut être long.