Open Access

Table 6

Economic scenario used in the optimization study.

Variables Values
Oil price 54.76 US$/STB
Gas price 0.70 US$/STB
Costs (US$/stb)
Oil production 10.952
Gas production 0.4675
Water production 1.1
Engineered water injection 1.98
Water injection 1.1
Investments (US$ millions)
Drilling and completion vert. well 22.8/m
Connection vertical well-platform 13.3
Platform Equation (9)
Fiscal Tax (%)
Royalties 10
Social taxes rate 9
Income tax 25
PIS1 1.65
COFINS1 7.6
1

PIS and COFINS are specific Brazilian taxes.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.