Table 3
Results obtained during the optimization procedures for Approach 3.
Step | Optimization | Results | Sims | dNPV (%) |
---|---|---|---|---|
1 | Weight WellPrior | 0% Qo, Ql, Qg, Qw, 10% Qwi (Arenito) | 12 | 3.1 |
2 | Pipe diameter/gas lift | RI:6″, FL:6″, PC:5″, QLIFT = 200 000 m³/day | 8 | 5.2 |
3 | Well number | Remove 1 wells (1 Carbonato) | 4 | 0.1 |
4 | Well placement | 8 iterations | 108 | 5.5 |
5 | Weight WellPrior (2nd) | 0% Qo, Ql, Qg, Qw, 10% Qwi (Arenito) | 1 | 0.0 |
6 | Pipe diameter/gas lift (2nd) | – | 1 | 0.0 |
7 | Well number (2nd) | – | 2 | 0.0 |