Table 2
Results obtained during the optimization procedures for Approach 2.
Step | Optimization | Results | Sims | dNPV (%) |
---|---|---|---|---|
1 | Pipe diameter/gas lift | RI:6″, FL:6″, PC:5″, QLIFT = 200 000 m³/day | 8 | 2.7 |
2 | Well number | Remove 1 well (Carbonato) | 4 | 0.5 |
3 | Well placement | 8 iterations | 100 | 6.6 |
4 | Pipe diameter/gas lift (2nd) | – | 1 | 0.0 |
5 | Well number (2nd) | – | 2 | 0.0 |