Table 1
Results obtained during the optimization procedures for Approach 1.
Step | Optimization | Results | Sims | dNPV (%) |
---|---|---|---|---|
1 | Reservoir ratio | 40% Qo, Ql, Qg, Qw, 50% Qwi (Arenito) | 7 | 13.1 |
2 | Pipe diameter/gas lift | RI:6″, FL:6″, PC:5″, QLIFT = 100 000 m³/day | 8 | 2.2 |
3 | Well number | Remove 9 wells (2 Arenito; 7 Carbonato) | 11 | 3.3 |
4 | Well placement | 8 iterations | 104 | 3.7 |
5 | Reservoir ratio (2nd) | 40% Qo, Ql, Qg, Qw, 40% Qwi (Arenito) | 4 | 0.1 |
6 | Pipe diameter/gas lift (2nd) | RI:6″, FL:6″, PC:5″, QLIFT = 200 000 m³/day | 1 | 0.2 |
7 | Well number (2nd) | Remove 1 well (Carbonato) | 11 | 0.0 |
8 | Well placement (2nd) | 8 iterations | 86 | 0.5 |