Table 1
Variables and criteria in Conceptual Design (CD) and Process Design (PD).
Variables |
Criteria |
|||||||||
---|---|---|---|---|---|---|---|---|---|---|
Synthesis | Design |
Yield | Product quality | Energy | OPEX | CAPEX | GWP | LCA | ||
Operating conditions | Sizing | |||||||||
Conversion | CD | CD | PD | CD | CD | CD | ||||
Separation | CD | CD | PD | CD | CD | CD | ||||
Energy balances | PD | PD | PD | PD | PD | PD | PD | |||
Pressure balances | PD | PD | PD | PD | PD | PD | PD |