Fig. 15

Download original image
NPV risk curves for the production strategy of the Base Case (E1), the best specialized production strategy (E9), the robust strategy obtained through a robust optimization procedure (EMR), and a robust strategy obtained by manually improving E9 (R4): a) NPV without economic uncertainty; and b) NPV with economic uncertainty.