The Schoonebeek Oilfield: the Rw-2e High Pressure Steam Injection Project
Gisement de Schoonebeek : le projet RW-2E d'injection de vapeur à haute pression
Nederlandse Aardolie Maatschappij B. V.
The daily oil production from the Schoonebeek Oilfield amounts to some 1400 m3 /d, of which ca. 65% is produced from a high pressure (85 bar) steam injection project. This project was started in 1981 and originally consisted of 7 structurally downdip/middip steam injectors. However, following the initially somewhat disappointing project performance, steam injection was moved to 4 middip/ updip injectors in 1984. This change in the location of the steam injectors, together with an increase in the level of surveillance and a more pragmatic reservoir management policy, has resulted in improved project performance. The ultimate extra oil/steam ratio for the total project is now expected to be 0. 7 m3 oil/ton of steam injected.
Résumé
La production de pétrole du gisement de Schoonebeek est d'environ 1400 m3/jour, dont près de 65% sont obtenus par injection de vapeur à haute pression (85 bar). Ce projet lancé en 1981 comportait initialement 7 injecteurs de vapeur orientés vers l'aval-pendage. En raison de performances décevantes, l'injection de vapeur a été transférée en 1984 sur 4 injecteurs travaillant vers l'amont-pendage. Ce changement de position des injecteurs, accompagné d'une surveillance renforcée et d'une politique de gestion du gisement plus pragmatique, a donné des résultats favorables. On pense que le rapport pétrole/vapeur pour l'ensemble du projet devrait être en dernière analyse de 0,7 m3 de pétrole par tonne de vapeur injectée.
© IFP, 1990