Table 3
Simulation conditions to select the appropriate number of clusters (greenfield).
(I, J) = (38, 3) | Hypothetical production well position |
(I, J) = (1, 1) | Hypothetical injection well position |
4000 | Pressure of production well (psia) |
6000 | Pressure of injection well (psia) |
2 | The production period (year) |