Table 3
Simulation conditions to select the appropriate number of clusters (greenfield).
| (I, J) = (38, 3) | Hypothetical production well position |
| (I, J) = (1, 1) | Hypothetical injection well position |
| 4000 | Pressure of production well (psia) |
| 6000 | Pressure of injection well (psia) |
| 2 | The production period (year) |