Open Access

Fig. 7

image

Download original image

Chemosteering log and real-time decision facilitated by the use of elemental geochemical analysis. Planned trajectory versus realised trajectory, all depths are in meters. (a and c) Planned trajectory and realised trajectory over the tops from prognosis coloured according to the corresponding zone ((a) coloured as per prognosed tops; (c) coloured as per tops during drilling); (b) geochemical log and the realised well trajectory, with the decision points marked along the wellbore.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.