Table 2
Injection quantity for well X1 and each of its sublayer based on the method presented in this work.
Sublayer | Thickness (m) | Porosity (%) | Cumulative water injection (104 m3) | Injection quantity for sublayer (m3/d) | Injection quantity for sand control section (m3/d) |
---|---|---|---|---|---|
1 | 9.5 | 33.6 | 49.95 | 88.23 | 132 |
2 | 3.2 | 33.4 | 16.83 | 43.76 | |
3 | 7.8 | 32.2 | 41.01 | 354.75 | 355 |
4 | 14.3 | 34.3 | 75.19 | 293.71 | 380 |
5 | 5.5 | 27.1 | 28.92 | 19.22 | |
6 | 5.1 | 31.1 | 26.81 | 66.78 | |
11 | 1.5 | 32.1 | 7.89 | 58.89 | 184 |
12 | 2.1 | 34 | 11.04 | 34.86 | |
13 | 4.7 | 33.3 | 24.71 | 89.84 |